KE helpline 118Free · No signup · Real PDF
Karachi outages

KE Load Shedding Schedule — Check Your Feeder (2026)

K-Electric load-shedding is feeder-wise in Karachi. Use the official channels below to fetch your area's exact outage timings — and learn why some feeders are exempt.

K-Electric load shedding schedule clock with darkened Karachi neighborhood
Area-wise K-Electric load shedding timetable for high-loss feeders in Karachi — durations vary from 0 to 10+ hours per day.

Quick Answer

To check the KE load-shedding schedule for your area, send SMS LS <13-digit account#> to 8119, or message "Hi" on WhatsApp 0348-0000118 and select "Load-shedding schedule". Karachi load-shedding is feeder-based — outage hours depend on your feeder's loss percentage, not your personal payment record.

3 ways to check your load-shedding schedule

SMS to 8119

LS 04000XXXXXXXX

Reply within seconds with today's outage hours.

WhatsApp 0348-0000118

Send "Hi" → choose Load-shedding schedule → enter account number.

Helpline 118

24/7 voice line. Useful when KE app or SMS is down.

How K-Electric calculates load-shedding hours

KE divides Karachi into thousands of 11kV feeders. Each feeder is assigned a category based on its Aggregate Technical & Commercial (AT&C) losses — line losses + theft + non-payment. The lower the loss, the less load-shedding that feeder sees. NEPRA approves the slabs.

Feeder categoryAT&C lossesDaily load-sheddingTypical areas
Exempt (E-1)≤ 10%0 hoursDHA, Clifton, PECHS, Bahadurabad, Gulshan-e-Iqbal Block 1–8
Low loss (C-1)10 – 20%~2 hoursF.B. Area, North Nazimabad, Gulistan-e-Johar
Medium loss (C-2)20 – 30%~4 hoursKorangi, Landhi, parts of North Karachi
High loss (C-3)30 – 50%~6 hoursOrangi, Baldia, parts of SITE & Malir
Very high loss (C-4)> 50%8 – 10+ hoursKati Pahari, Lyari pockets, theft-prone areas

Categories and hours adjust with seasonal demand — summer (May–Sep) usually adds 1–2 hours per category.

Typical load-shedding times in Karachi

K-Electric concentrates planned outages around peak demand windows when grid stress is highest:

  • Morning peak: 8:00 AM – 11:00 AM (commercial start-up)
  • Afternoon: 1:00 PM – 4:00 PM (AC + industrial load)
  • Evening peak: 7:00 PM – 11:00 PM (residential cooling & lighting)

How to reduce or avoid KE load-shedding

  • Pay your bills on time — collective recovery improves your feeder's category.
  • Report theft via speakup@ke.com.pk — kunda removal upgrades feeder loss class within weeks.
  • Install KE net metering + a small battery bank for true 24/7 supply.
  • UPS or inverter sized for fans, lights and chargers covers 2–4 hour outages comfortably.
  • Premium-feeder programmes in some commercial pockets pay extra tariff for zero load-shedding.
  • Smart appliances: Run washing machine, water motor and EV chargers between outages using off-peak slots.

Power breakdown vs scheduled load-shedding

A scheduled load-shed follows the published timetable. A breakdown is unplanned — transformer trip, cable fault, weather damage or grid tripping. Report breakdowns immediately so KE dispatches a crew:

Editorial note: load-shedding categories, hours and feeder boundaries are reviewed by K-Electric every few months. Schedules can change overnight during heat-waves or fuel shortages — always re-check via SMS/WhatsApp on the day.

KE load-shedding FAQs

How do I check the K-Electric load-shedding schedule for my area?+

Send LS followed by your 13-digit K-Electric account number to 8119 by SMS, or message 'Hi' to KE's official WhatsApp 0348-0000118 and pick 'Load-shedding schedule'. Both return your feeder-wise outage timings. You can also call helpline 118.

Why is there load-shedding in Karachi if I pay my bill on time?+

Load-shedding in Karachi is feeder-based, not consumer-based. KE classifies each feeder by aggregate losses (line losses + theft + unpaid bills). Low-loss feeders see little or no scheduled load-shedding; high-loss feeders see longer outages. Even fully paid-up consumers on a high-loss feeder share the schedule.

How many hours of load-shedding does K-Electric do?+

Exempt feeders (≤10% losses) see 0 hours of scheduled load-shedding. Standard feeders see 2–4 hours. High-loss feeders can see 6–10+ hours daily, increased during summer demand peaks (May–September).

What is the difference between load-shedding and a power breakdown?+

Load-shedding is a planned, scheduled outage to manage supply-demand. A breakdown is an unplanned fault (transformer trip, cable fault, weather damage). Report breakdowns via WhatsApp, SMS COMP <account#> to 8119, or call 118.

Is there any way to avoid K-Electric load-shedding?+

Yes — install KE net metering with solar, get an UPS/inverter system, or move heavy loads to non-load-shedding hours. Some societies opt for the 'Independent Feeder' programme by paying premium tariff for zero load-shedding.

Does load-shedding affect my KE bill?+

No — your bill is based on units consumed, not hours of supply. Load-shedding actually reduces your bill because no units are billed during the outage. The minimum monthly charge still applies.

Continue reading

Related guides